英语人>词典>汉英 : 上肋 的英文翻译,例句
上肋 的英文翻译、例句

上肋

词组短语
prime rib
更多网络例句与上肋相关的网络例句 [注:此内容来源于网络,仅供参考]

It builds the whole liquid-cooling system mainly by the design of the liquid-cooling decalescence boxes(improve its bottom material from aluminium alloy to pure copper, enlarge its volume, better cooling effects, and strengthen pressurization), by the operations of cooling effect about the heat exchanger worked by its temperature adjustability of the ribs(diffuse the heat fleetly owing to the excellent diathermancy of the material of the ribs ,make effective diathermancy owing to ribs outside areas, and drive the heat of the ribs away by the fans), and by the water pump made up of the piezoelectric ceramic with the excellent performance-no electromagnetism interference, little cubage, little noise, light exterior, light weight, low consume, high flux, replacing the mechanical pump.

在液冷散热器的研究中,主要通过对液冷吸热盒设计不断地改进(使吸热盒底部的材料从铝合金变为纯铜材料,其整个体积有所变大,但其散热效果明显变好,且密封性得到了极大地加强),综合地运用换热器中肋片的壁面温度调节作用产生的散热效果(肋片材料优良的导热性,快速地扩散了热量:肋片较大的与流体接触的表面积,使传热更加充分,对流热阻大大减小;再利用风扇对肋片上的热量进行吹散),利用性能优良的压电陶瓷泵(该泵机电性能稳定,具有无电磁干扰、体积小、噪音小、外型轻薄、重量轻、低能耗。、高扬程等优点。)代替机械泵作为驱动源,搭建了整个散热系统。

I followed the curve that rose from the capitals of the semicircle of columns and ran along the ribs of the vault toward the key, mirroring the mystery of the ogive, that supreme static hypocrisy which rests on an absence, making the columns believe that they are thrusting the great ribs upward and the ribs believe that they are holding the columns down...

我从列柱的半圆形柱头顺著柱子向上望去,看过拱形屋顶上一根根相楔的肋。这些柱子和肋状梁木反映了哥德式建筑穹窿弧稜的奥秘,亦即以空茫为基础的至高统计假设,使列柱以为是它们将那些大肋擎向空中,而那些肋状梁木却以为是它们巩固了向下延伸的圆柱

In this paper, we use FEM software ANSYS to simulate. Using FEM to evaluate the strength of pressure hull, the FEM model of outer covering and stiffeners can use shell element to establish, but it may waste much computing time to calculate. Therefore, in this paper, we can evaluate more easier by making use of the idea of effective-width, and considering the stiffener/plating combined moment of inertia.

本文采用有限元素分析软体ANSYS进行求解,在有限元素分析的模拟上,外壳与环肋均可用壳元素建立一实体模型来分析,但是在模型的建立上过於复杂,在解析上也需要更多的时间来计算,因此本文采用有效幅度的观念,考虑环肋与壳板间之组合惯性矩,将环肋部分取梁元素来模拟,如此一来可简化建立模型的困难度,且大大的缩短分析的时间。

Results The anatomic structures of "Jianzhongshu" for perpendicular insertion downward were skin, superficial fascia, trapezius, rhomboideus, splenius cervicis, erector spinae, suprapleural membrane and cupula of pleura in order.The anatomic structures of "Dazhu" were skin, superficial fascia, trapezius, rhomboideus, upper posterior serratus, splenius cervicis, erector spinae, levator ribs, internal intercostal membrane and costal pleura in order.

结果 肩中俞向下直刺的解剖结构依次是皮肤、浅筋膜、斜方肌、菱形肌、颈夹肌、竖脊肌、胸膜上膜、胸膜顶;大杼穴向下直刺的解剖结构依次是皮肤、浅筋膜、斜方肌、菱形肌、上后锯肌、颈夹肌、竖脊肌、肋提肌、肋间内膜、肋胸膜。

A reinforcing rib used in Gothic vaulting to connect the intersections and bosses of the primary rib s.

枝肋哥特式拱顶上的一种用于加固的肋,连接主肋上的交点或凸饰

Results The anatomic structures of "Jianzhongshu" for perpendicular insertion downward were skin, superficial fascia, trapezius, rhomboideus, splenius cervicis, erector spinae, suprapleural membrane and cupula of pleura in order.The anatomic structures of "Dazhu" were skin, superficial fascia, trapezius, rhomboideus, upper posterior serratus, splenius cervicis, erector spinae, levator ribs, internal intercostal membrane and costal pleura in order.

结果 肩中俞向下直刺的解剖结构依次是皮肤、浅筋膜、斜方肌、菱形肌、颈夹肌、竖脊肌、胸膜上膜、胸膜顶;大杼**向下直刺的解剖结构依次是皮肤、浅筋膜、斜方肌、菱形肌、上后锯肌、颈夹肌、竖脊肌、肋提肌、肋间内膜、肋胸膜。

The arch bending on the top of the original main arch ring corresponds to every arch rib and the bottom beam on its landscape orientation. As a result it becomes a down arc frame similar to slab-and-beam floor system. On the arch bending and bottom beam just established, standing pillar, main beam, horizontal rib beam and bridge front-panel would be built subsequently. Both ends of the main beam would then be put off the new hat beam made of reinforced concrete. Now, it becomes an upper slab-and-beam floor system. Two decks will be joined together on the middle of the bridge, which forms the ability of spanning and loading.

在原主拱圈拱肋相应位置处增设拱伏,横向增设底梁,形成一个下层弧形的类似肋梁楼盖的结构;在已浇筑好的拱伏与底梁上,继续现浇立柱、主梁和横向肋梁、桥面板,主梁的两端搁置在桥台处新增加的钢筋混凝土台帽梁上,形成一个上层肋梁楼盖结构,并且上下两层楼盖在桥梁跨中互为渗透结合成一个牢固的整体,共同完成了跨越和承载的能力。

The internal forces of the main arch springers are calculated in different rise-span ratios of top and bottom arch ribs. The internal forces of arch ribs and deformations of main spans are calculated in 1/5, 1/4 rise-span ratios of top and bottom stacked arch ribs and in 1/5 rise-span ratio of dumb-bell arch ribs.

给出上、下拱肋为不同矢跨比情况下的主拱拱脚截面内力,当叠合拱桥的上、下拱肋矢跨比分别采用1/5、1/4与矢跨比为1/5的哑铃拱拱肋的内力和主梁及拱顶变形计算结果。

In Group I, catheter was placed into central vein. PCIA solution contained 0.025% morphine. PCIA was commenced with a loading dose (2-5 mg) of morphine. The PCIA pump was set up with a background infusion of 2 ml/h, 1 ml bolus dose and a 15-minute lockout interval. In Group II, four intercostal nervers were freezed (-70 degrees Celsius) for 90 seconds. Pain intensity was measured at differnt time [1, 4, 8, 12, 24, 48 and 72 hour after operation] using VAS scoring.

选择80例接受开胸手术的病人,随机分为静脉镇痛组和神经冷冻组,静脉镇痛组行术后病人自控静脉镇痛,后者采用北京库蓝公司JT-1型冷冻治疗仪在关胸前对切口所在肋间及上、下各一肋间和放置胸引瓶所在肋间的肋间神经进行冷冻,以VAS评分判断两组术后胸部切口疼痛情况,并记录不良反应。

The distances between inferior margin of 12th rib and the 3 above-mentioned nerves were all measured. Results: The superior lumbar triangle was quadrilateral (55%), triangular (35%) or irregular (5%). If the 12th rib was too short, the upper border of the triangle would be the 11th rib (5%). Four grouping patterns of the 3 nerves were found in front of the triangle, and the average distance between inferior margin of 12th rib and the 3 nerves was (16.92±6.32)mm,(59.49±14.97)mm and (112.49±17.15)mm, respectively.

结果:腰上三角的形态可为四边形(55%)、三角形(35%)和不规则形(10%),该三角的上界可完全由第11肋(5%)构成;肋下神经、髂腹下神经和髂腹股沟神在腰上三角前方有4种不同的组合形式,三神经与第12肋下缘的平均距离分别为(16.92±6.32)mm、(59.49±14.97)mm、(112.49±17.15)mm。

更多网络解释与上肋相关的网络解释 [注:此内容来源于网络,仅供参考]

And Og king of Basan: for his mercy endureth for ever:肋未家族,也请讚颂上主!敬畏上主的人,讚颂上主

以色列家族,请讚颂上主!亚郎家族,也请讚颂上主! S... | 肋未家族,也请讚颂上主!敬畏上主的人,讚颂上主! And Og king of Basan: for his mercy endureth for ever. | 住在耶路撒冷的大君,愿他由熙雍承受讚颂! And he g...

subcostal artery:肋下动脉

肋间后动脉 posterior intercostal arteries | 肋下动脉 subcostal artery | 膈上动脉 superior phrenic artery

upstanding beams slab:上肋形板

upright course 竖立砌层 | upstanding beams slab 上肋形板 | urban area 城市地区

costotransverse ligament:肋横突韧带

肋横突孔|costotransverse foramen | 肋横突韧带|costotransverse ligament | 肋横突上韧带|superior costotransverse ligament

costoxiphoid ligaments:肋剑突韧带

肋间最上静脉|highest intercostal vein | 肋剑突韧带|costoxiphoid ligaments | 肋角|costal angle, angle of rib

intermuscular:或upper rib 上肋

intermedium 间腕骨 | intermuscular 或upper rib 上肋 | interorbital septum 眼窝间隔

superior salivatory nucleus:上泌延核

上肋凹|superior costal fovea | 上泌延核|superior salivatory nucleus | 上面|superior surface, trochlear surface

supracostal:肋上的

鸟喙上孔 supracoracoid foramen | 肋上的 supracostal | 基节上的 supracoxal

suranal plate; supra-anal; epiproct:肛上板

上肋间动脉 supreme intercostal artery; arteria | 肛上板 suranal plate; supra-anal; epiproct | 上隅骨 surangular; supra-angular

superior tibiofibular joint:上胫腓关节

上睑板 superior tarsus | 上胫腓关节 superior tibiofibular joint | 上肋凹 superior costal facet