roof caving
- roof caving的基本解释
-
-
顶板垮落, 冒顶
- 相似词
- 更多 网络例句 与roof caving相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Supporting type is suggested to be developed into 3-prop to improve adaptability besides 2-prop and 4-prop. The difference of caving difficulty degree of coal seam is the base of caving coal method at high, medium and low position. Caving with small step and open caving flashboard used widely not only cause serious mixture of coal and rock but also hinder the improvement of top coal recovery. So we suggest caving with large step or closing caving door. Four-bar-mechanism of hydraulic support restricts development of new style caving powered support. Stabilization framework of expansion link and all-shield caving tail beam at high, medium and low position are introduced here.
支架支护型式,除了两柱、四柱以外,建议开发三柱支架以改善适应性;煤层冒放性的差异,是高位、中位和低位放煤方法存在和使用的依据;目前广泛采用的小步距放煤和开放式放煤插板不仅造成严重混矸漏矸,也妨碍顶煤回收率的进一步提高,建议采用大步距放煤和可关闭放煤口;液压支架四连杆稳定机构,制约了新型放顶煤液压支架的开发,介绍了液压支架伸缩杆稳定机构及全掩护拖移高位、中位和低位放煤尾梁。
-
Aiming at bottom roof caving and support impact problems induced with abrupt large scale caving upper roof in face 21303 of Daliuta mine, this paper put forward the motion parameter at roof caving and calculation formula of roof shear breaking force with the help of theorem of momentum, theorem of moment of momentum and D' Alembert principle. Roof caving process was simulated by Ansys Ls-DYNA program, and maxim impact force was got. The theoretical research outcomes in the paper were applied in face 21303 of Daliuta mine, and were accordant with actual observing status of roof caving process.
针对神东煤炭公司大柳塔煤矿活井21303综采工作面,上层采空区顶板突然大规模垮落对下层顶板及支架的突然冲击问题,文章采用动量定理、动量矩定理、达朗伯原理推出了顶板垮落瞬间的运动量及顶板切顶垮落所需要的剪力值计算公式,用ANSYS LS-DYNA程序对顶板垮落过程进行了数值计算,得到了最大冲击力,在大柳塔煤矿活井21303综采工作面对顶板垮落特征进行了实际观测和理论成果验证。
-
The trial results show that with the disposal of induced caving roof by presplitting blasting and induced caving roof blasting, about 17.8 m in thickness of rock cushion is successfully formed in the inferior abandoned stope, which can bring down the harm of dashing blast of an explosion caused by roof collapse; apparent run-through flaws arise between presplitting blasting holes, and controllable caving is formed in the roof, abrupt collapse of large area roof is prevented, the productional safe surroundings of underground mining is improved; eventually, the resources' reclamation rate is improved from about 70% to 84.6%, and the dilution rate is abated from 25%40% to below 15%, so efficiently withdrawing is actualized.
试验结果表明:采用预裂爆破与诱导崩顶爆破的方法,通过对顶板的诱导崩落处理,成功地在下方采空区形成了厚度为17.8 m左右的岩石缓冲垫层,有效地降低顶板冒落带来的冲击气浪危害;在预裂孔间产生明显的贯通裂隙,从而在顶板上形成诱导可控崩落,防止顶板大面积的突然垮落,改善地下开采安全生产环境;最终资源的回收率由70%左右提高到84.6%,贫化率由25%~40%降低到15%以下,实现了资源的高效回收。
- 更多网络解释 与roof caving相关的网络解释 [注:此内容来源于网络,仅供参考]
-
Roof panel - complete - Integral roof rack fitted, Local strip:整个车顶板(装有整体式车顶行李架)局部拆卸
"Roof panel - complete - Integral roof ra... | "Roof panel - complete - Integral roof rack fitted, Local strip","整个车顶板(装有整体式车顶行李架)局部拆卸" | "Roof panel - complete - Integral roof rack ...
-
Roof panel - excluding roof opening panel, Local strip:车顶板(不包括车顶开口面板)局部拆卸
"Roof panel - excluding roof opening panel, Comp... | "Roof panel - excluding roof opening panel, Local strip","车顶板(不包括车顶开口面板)局部拆卸" | "Roof panel - excluding roof opening panel, Local c...
-
caving line:放顶线
caving chock 木垛 | caving line 放顶线 | caving method 崩落开采法