fender boom
- 相似词
- 更多 网络例句 与fender boom相关的网络例句 [注:此内容来源于网络,仅供参考]
-
QUY220 fully hydraulic crawler crane is equipped with multiple boom configuration including base boom, light boom, fixed jib and tower attachment, the maximum boom length for light boom is 96m, which with tower attachment is 117m, 3 boom offset angles match 99 boom combinations for tower attachment.
不完整,我来编辑QUY220全液压履带起重机具有多种吊臂类型配置,包括基本型主臂、轻型主臂、固定副臂和塔式副臂,轻型主臂最长达96米,加装塔式副臂可达117米,3种主臂角度配合99种臂架组合的塔式工况。
-
Calibration tool storage cabinet rolling rack w/lights statu go rack rolling rack w/hardhats.tool.rarts metal work station office chairs 7"miter band saw fiberglass backing plates 12"band saw filing cabinets 7 air conditioners 6 humidifiers 2 grinders 2-carts w/testing equipment golf cart 6 utility carts left upper wing right upper wing 4 rolls of final bagging disassembled lay up room lexan 4*8*9/8 3 roof top air ducts preforming core fuselage to wing part non conforming steel/alominum insulation tubes left lower wing right lower wing horizontal upper tail 2 sheets of 1honeycomb core office cubicles cabin door frame template 1 medium size cabinet 2 small cabinets flammable container L.H.boom inboard flap hinge(2) R.H.boom inboard flap hinge(1) L.H.outboard nacelle little fuse CSL mold AFT keelgusset mold LH boom inboard mold RH boom outboard mold LH upper fuel tank mold RH lower fuel tank mold universal safety mats(13) aileron bond/drill jigs metal saw hooses 5-lay up tables safety mat trim kit empty rack office chairs left assembled boom right assembled boom utility carts small file cab bagging material black med.
标定工具储藏柜轧制机架瓦特/灯 statu去机架轧制机架瓦特/ hardhats.tool.rarts 金属工作站办公椅 7 &字带锯玻纤板支持 12 &带锯档案柜 7空调 6加湿器 2磨床 2 ,车瓦/测试设备高尔夫球车 6实用车左上翼右上翼 4卷最后套袋拆卸积储室聚碳酸酯4 * 8 * 9月8日 3天台冷气槽预成形核心机身的一部分,以翼不符合钢铁/ alominum 保温管左下翼右下翼横向上尾 2张1 蜂窝芯办公室隔间舱门框模板 1中型内阁 2小柜易燃集装箱 L.H.boom内侧襟翼铰链( 2 ) R.H.boom内侧襟翼铰链( 1 ) L.H.outboard发动机舱小保险丝CSL的模具霉菌毒素keelgusset 黄体生成素臂船模生殖健康繁荣舷外模具激素上油箱模具相对湿度较低的燃料箱模具普遍安全垫( 13 )副翼债券/钻夹具金属看到hooses 5 -奠定表安全垫装饰盒空架办公椅离开组装繁荣正确组装繁荣实用工具车小档案驾驶室套袋材料黑色med。
-
Half-round fender to be fitted to the shell plating from forward shoulders to the aft shoulders at upper deck level and 1.50 m below upper deck. In addition, half-round fender to be fitted in way of forecastle and poop at two levels to secure that no mooring rope touch the shell. The fender to be of pipe 150 mm x 15 mm with flat bar inside. Fenders to be well supported from backside.
在船壳板的上甲板和上甲板以下 1.50m 位置处,分别安装有从艏尖突至艉尖突的半圆形护舷木,同时在艏楼和艉楼的两个位置上应安装有半圆形护舷木以确保系泊缆绳不与船壳板接触,并直径为 150mm×15mm 钢管的护舷木内部带有扁钢,以便对护舷木从背部进行很好地支撑。
- 更多网络解释 与fender boom相关的网络解释 [注:此内容来源于网络,仅供参考]
-
fender boom:拦护河绠
fence post 篱柱 | fender boom 拦护河绠 | fenestriform pit 窗格形壁孔