查询词典 overall loading
- 与 overall loading 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Based on the analysis of finished auto's loading/unloading process of AnJi-TNT Logistics, propose the maximum transportation capacity optimization of every Car-carrier loading with different goods-cars. Construct the scheme database of optimization for Car-carriers'loading in SQL-server 2000 database software. The optimization toward loading orders in customization is resolved with maximum transportation's capacity algorithm and matching scale method with Visual Basic background.
本文结合安吉天地汽车物流有限公司整车物流调度系统的配载流程进行分析,通过整数规划计算出每辆轿运车针对不同商品车的最大运能配载方案,在SQL-Server数据库平台下,对这些最大运能配载方案按一定规则保存并进行数据库的管理,最后利用事例推理在Visual Basic开发环境下提供面向客户混装订单的轿运车配载方案优化的解决方案,并进行了实例验证。
-
Finite element software ANSYS was employed to investigate the mechanical response of asphalt pavement structure under the axisymmetrical dynamic loading,and different loading period,loading amplitude and loading form were discussed in detail.
运用有限元程序ANSYS,采用轴对称模型,求出了沥青路面在动荷载作用下的力学响应,并针对不同的荷载作用周期、荷载幅值以及不同的荷载作用形式进行了详细的分析与讨论。
-
In Chapter Four, the surface fracture was studied for a functionally graded plate with a semi-elliptical surface crack under state thermal loading, and studied the influence of crack sizes, aspect ratios and material property on the stress intensity factors along a crack-front under two types thermal loading: calefactive state thermal loading and descent state thermal loading.
第四章研究了含有半椭圆表面裂纹的功能梯度材料板条在稳态温度热载荷作用下的裂纹问题分析,着重考虑了升温载荷及降温载荷作用下应力强度因子在裂纹前沿的分布及材料梯度及裂纹与板的几何尺寸对应力强度因子的影响。
-
In studies of interaction among pile, platform that above it and surrounding soil, this paper employ the concept of plate element to simulate the loading character of platform, and employ the concept of solid element to simulate the character of pile and soil, using the finite element method after understanding the geometry properties of pile, soil and the platform. Analyzing the loading properties of the three entities above and their deformation, this paper also employ a special element, Penalty Element. The introduction of penalty element of this kind has served to guarantee the join harmony of displacement between solid element and plate element, thereby effectively resolving the join problem between platforms, pile that support it and surrounding soil.Considering significant property difference between pile material and its surrounding soil, there may be much shear stress on their contact interface produced under vertical load, thus causing displacement or fission. Therefore it is necessary to adopt one special constitutive law of this kind of contact interface, which can reflect its feature of loading and deformation thoroughly. On the basis of the deformation feature and constitutive laws of some contact interface obtained by Zhang Dongji and people concerned through some single-shear experiments on contact interface between structure and soil, this paper employ one pile-soil three-dimensional constant thickness contact interface model to simulate the " slide" taken place on the interface between pile and its surrounding soil. With this kind model, this paper has also created one finite element model, which can be applied to perform finite element calculation and analyze the pile-loading feature, and deduced its element stiffness matrix.
在承台-桩-土共同作用中,考虑桩与承台的几何特性,采用有限元方法,用实体单元模拟桩土,用板单元模拟承台,更具体地分析桩和承台的受力特性和变形,而且还采用罚单元—既实体单元与板单元之间连接必须满足变形协调条件,来有效地解决了承台与桩土的连接问题,且在桩土共同作用中,由于桩体结构的材料性能与周围土层性质相差较大,在竖向荷载下有可能在其接触面上产生较大的剪应力从而导致错动或开裂,因此,为了充分反映桩土接触面上的受力及变形特征,应采用一种桩土接触面特有的本构关系,即利用张冬霁等人关于结构与土体接触面单剪试验所得到的接触面变形特征及其本构关系,引入桩-土三维等厚度接触单元来模拟桩与桩侧土之间的&滑移&,在此基础上建立可用于桩基承载性状分析的有限元计算单元模型,并推导出了各单元的刚度矩阵。
-
This paper stands in the railroad surmounts the type development and the railroad reforms the experiment site the angle, auxiliary industry changed the system the overall plan to the Chengdu Railroad Bureau host auxiliary separation to conduct the research, has profited from some foreign enterprises industry success reforms experiences, from the railroad bureau host auxiliary industry overall situation, the host auxiliary separation overall mentality and the target programming,"three kind of properties" the overall situation and mixed the principle, the auxiliary industry separation changes the system the bare bone, the experiment site enterprise implements the plan, straightens out the property right to relate several aspects to make the multianalysis elaboration.
对成都铁路局辅业改制分流工作提出了一些看法和实施意见。本文采用了实证研究与案例分析、定性分析与定量分析并重的研究方法,做到了系统与局部相结合、理论与实践相结合、经验与分析相结合,把实证的、规范的、对策的研究结合起来,体现了理论与实践相结合的原则。各种研究经验和取得成效对成都铁路局运输主业和辅业的发展具有很大的指导意义。
-
More than 30 papers have been published and 5 invention patents have been possessed. Major achievements include: 1 Completion of solar dish power system overall design and equipment commissioning; 2 Completion of parabolic trough power system overall design and equipment commissioning; 3 Parabolic trough concentrator overall design and instantaneous simulation of thermal-technical performance; 4 Overall design of heliostat and wind load simulation; 5 Quick evaluation methods for thermal performance of solar collector; 6 Design of dehumidifying air conditioner using solar evacuated air collector; 7 Research on radiation, flow, conduction coupling and heat exchange on complex ship surfaces
其主要学术贡献为: 1MW级太阳能塔式电站总体设计; 1完成了太阳能碟式聚光发电系统的总体设计和设备调试; 2完成了太阳能槽式聚光发电系统的总体设计和设备调试; 3槽式太阳能聚光器的总体设计与热工性能的瞬态模拟; 4太阳能聚光器定日镜的总体设计和风载荷模拟; 5了太阳能集热器热性能快速评价方法体系; 6太阳能真空管空气加热除湿空调系统的系统设计和设备定型; 7复杂船体表面的辐射、流动与导热耦合换热的研究。
-
However, most of these investigations focused on the rotating beams or plates undergoing a prescribed large overall motion, where the effect of large overall motion of the reference frame on elastic deformation was considered but at the same time the beam's elastic deformation couldn't influence the large overall motion of the reference frame because the large overall motion is known a priori. In fact, this kind of problem on the dynamic stiffening is a structural dynamics problem in a non-inertial frame.
值得指出,上述这些研究工作都局限于大范围运动为已知情况下的非惯性系下柔性体的动力学性质,实质上是一个非惯性系下的结构动力学问题,只考虑了大范围运动对变形运动的影响,而没有充分考虑到大范围运动和变形运动之间的相互耦合作用,这种耦合作用是单向的。
-
Commencing from the character analysis of overall stiffness matrix of finite element method, the author brings forward it which is important to realize full nonzero memory of overall stiffness matrix, obtains correlative interlink of nodal point from analyzing affiliated element of nodal point, conforms every submatrix's position in overall stiffness matrix, realizes full nonzero memory of overall stiffness matrix.
论文根据面向对象程序设计的特点,建立了有限元模型的相关类,给出了基本的程序设计框架。
-
The 352 valid samples were analyzed by SPSS. The results showed there was no distinct corresponding relationship between the product attributes and reaction time. The different key attributes from questionnaire importance rating and the shortest reaction time standards were used to regressively analyze the results of customers' overall rating (such as overall satisfaction,objective quality, recommend intention).The results indicated that the coefficiency of regression of the special attributes chosen from reaction time to overall rating was distinct, while the coefficiency of the special attributes chosen from importance rating to overall rating was not. The main conclusions are: 1. Regarded attributes can be obtained by the reaction time of brand performance rating.
本实验的有效样本为352个,通过SPSS软件进行分析统计,数据统计结果显示,在品牌表现评价反应时与其重要性问卷评定结果的相关系数的检验中,并未发现品牌表现评价反应时与品牌属性重要性评定结果之间的显著相关;将由问卷重要性评价最高标准所得到的关键属性与通过品牌表现评价反应时最短的标准所选取的关键属性的品牌表现分别对消费者的总体评价结果(如&总体满意度&、&主观质量&、&推荐意向&)进行回归分析,发现通过品牌表现评价反应时方法选取的特殊关键属性(与问卷重要性评定法选取不一致的关键属性)的品牌表现对总体评价结果的回归系数显著,而重要性评定问卷法选取的特殊关键属性(与品牌表现评价反应时法选取的不一致的关键属性)的品牌表现对总体评价结果回归系数不显著。
-
At present, 70,000 tons / year of adipic acid project completed the overall progress of the project 98%, adipic acid and related projects have been the end, assistive devices and production equipment also has entered the pre-production stage; and 50,000 tons / year project alcohol ketone the overall progress of the project completed 99%, nitric acid and hydrogen projects overall progress of the project 98 percent completed, with test conditions; In addition, 704 pumping stations - natural gas pipeline project Dushanzi overall progress of the project 98 percent completed.
目前,7万吨/年己二酸项目总体工程进度完成了98%,己二酸及配套项目施工已经收尾,辅助装置和生产装置也已经进入试生产阶段;且5万吨/年醇酮项目总体工程进度完成了99%,硝酸及制氢项目总体工程进度完成了98%,具备试车条件;另外,704泵站-独山子天然气管道项目总体工程进度完成了98%。
- 相关中文对照歌词
- Blue Overall
- More Justice
- Somos Extremes No Esporte E Na Música
- Southern Hospitality
- Life's Zombies
- All I Want Is Everything
- Across The Line (Unreleased 2007 Demo)
- Across The Line
- Believe Me
- This Mess
- 推荐网络例句
-
Chinese traditional virtue is humility and wariness,the compliment and praise to the others should be declination
中国人的传统美德是谦虚谨慎,对别人的恭维和夸奖应是推辞。如
-
We bought this house on the never-never.
我们以分期付款的方式买下这座房子。
-
If they did move, and saved the penalty, the referee could insist on the penalty being retaken. In a Scottish 1945 game between Kilmarnock and Partick Thistle, Tommy White had to take a penalty seven times!
如果移动了,而且救出了点球,之前的点球可以视为无效,并重新再罚一次点球。1945年在 Kilmarnock 对阵Partick Thistle 的苏格兰联盟杯比赛中,判给其队的一次任意球,Tommy White却踢了7次。