英语人>网络例句>construction drawing 相关的网络例句
construction drawing相关的网络例句

查询词典 construction drawing

与 construction drawing 相关的网络例句 [注:此内容来源于网络,仅供参考]

My main production plant: Diamond Drawing Die, die of natural Drawing, polycrystalline Drawing Die (square, flat line, 2.60, etc.), cd Drawing Die, Die Carbide, drawing die, spiral die, die stamping, Nail Die, Roll plate, powder-coated, straight-mode (the standard-subscript)-reduction mode, a line-and gas-wire for mold (500 kilograms, not the general bias), welding electrodes Die (wire feeding flywheel , Ramps round, the former silk eyes, pipe knives, straight-tile block, powder-coated, etc.), wire and cable die, die square, flat-Die, Die, such as 2.60 and high-tech drawing powder, recycling all kinds of Carbide, Sales: Chau-Carbide blank, Zigong Carbide rough.

我厂主要生产:钻石拉丝模,天然拉丝模具、聚晶拉丝模具、cd拉丝模具、硬质合金模具、拉伸模、螺旋模、冲压模、制钉模、搓丝板、涂粉模、直杆模缩杆模、合线模、气保焊丝专用模具(一般500公斤不偏差)、电焊条模具(送丝飞轮、斜轮、前丝眼、圆管刀、调直瓦块、涂粉模等)、电线电缆模具、正方模具、扁线模具、六角模具等以及高科技拉丝粉,回收各种硬质合金,销售:珠洲硬质合金毛坯,自贡硬质合金毛坯。

On the basis of introducing principle and typical equipments of hydro-forming deep drawing, the HDD has been divided into five typical kinds as follows: hydro-forming deep drawing without punch, deep drawing with fluid assisted blank-holder, deep drawing with hydraulic counter pressure, hydro-mechanical deep drawing, and internal high-pressure deep drawing.

在阐述板料液压拉深方法原理和分析国内外板料液压拉深典型装置的基础上,将板料液压拉深方法分为液压软凸模拉深、液压辅助压边拉深、对冲液压拉深、液压-机械拉深和内高压拉深等5种。

Given the present situation of art designing and the significance of hand drawing, this paper makes three suggestions to train students hand drawing ability: first, to clarify the relationship between hand drawing and computer designing with the stress on the former; second, to distinguish the effect of hand drawing and that of common drawing to cultivate students' esthetic ability; third, to define the relationship between hand drawing and thinking.

从艺术设计现状出发,指出手绘的重要意义,并着重就培养艺术设计专业学生的手绘能力提出教学建议:一是要明确手绘表现与电脑制作的关系,重视手绘对于设计师的辅助作用;二是要明确手绘效果图与一般绘画的区别,培养学生审美能力,增强艺术修养;三是要明确手绘表现与思维的关系,做到理论与实践相结合,提高设计水准。

Construction and installation (work volume of construction and installation) refers to the construction of various houses and buildings and installation of various kinds of equipment and instruments, including construction of various houses, equipment foundations and industrial kilns and stoves, preparation works for project construction, and clearing up works post project construction, pavement of railways and roads, drilling of mines and putting up of oil pipes, construction of projects water conservancy, construction of underground air-raid shelters and construction of other special projects, installation of various machinery equipment, testing operation for pre-testing the quaily of installation projects.

建筑安装工程:指各种房屋、建筑物的建造工程和各种设备、装置的安装工程。包括各种房屋建造工程,各种用途设备基础和各种工业窑炉的砌筑工程;为施工而进行的各种准备工作和临时工程以及完工后的清理工作等;铁路、道路的铺设,矿井的开凿及石油管道的架设等;水利工程;防空地下建筑等特殊工程;以及各种机械设备的安装工程;为测定安装工程质量,对设备进行的试行工作。

The entrance section of FuXi Double-arched Tunnel is modeled in the fact of factual shallow buried and unsymmetrical pressure condition. Adopting the three heading construction method to simulate twelve kinds of construction projects, confirm reasonable construction orders and left and right tunnel face interval, systematically analyze and research the changing law of the tunnel deformation and surrounding rock stress in soft and cracked condition of surrounding rock,bring forward pertinent advices against construction disease; Build the deep buried tunnel model in middle section of tunnel , separately adopt the central heading bench cut benching method and the central heading full cross method to simulate ten kinds of construction projects, establish the reasonable construction orders, sidestep length and tunnel face interval, which are due to the deep buried tunnel, systematically analyze and research the change law of the tunnel deformation and surrounding rock stress in the section with good surrounding rock condition, bring forward the reasonable construction projects which can make sure of construction safety and save construction time; Because the central wall is disturbed many times during constructing process, its displacement and stress distribution is very complex.

富溪隧道进口段依照实际的浅埋偏压状况建立模型,采用三导洞法开挖模拟了12种方案,确定了合理的施工顺序和左右主洞掌子面错距,系统地分析研究了软弱破碎围岩浅埋偏压段施工的隧道变形和围岩应力变化规律,提出了防止施工病害的针对性建议;洞身段按深埋隧道建立模型,分别采用中导洞台阶法和中导洞全断面法模拟了10种方案,确立了适合深埋隧道的合理施工顺序、台阶长度和掌子面错距,系统分析研究了围岩较好深埋段施工的隧道变形和围岩应力变化规律,提出了兼顾施工安全和节省工期的合理施工方案;由于受到多次扰动,中隔墙的位移和应力变化规律较为复杂,通过对各种方案的对比分析,得出了中隔墙在施工不同阶段的位移变化规律、应力变化规律和应力分布规律,尤其对于浅埋偏压段隧道施工时中隔墙位移和应力变化规律做了深入研究,提出了合理的施工建议。

This thesis firstly elaborates on researches at home and abroad on factors affecting the development of the construction industry, defines the contents of the construction industry, introduces its function and expounds the impact mechanism of various factors affecting the construction industry. Secondly, this thesis carries on a brief analysis on the current situation of development in Anhui construction industry to reflect its achievements and shortage since the beginning of reform and opening up, and makes a comparative analysis and comprehensive evaluation on the regional development level of Anhui construction industry through the method of Factor Analysis. Thirdly, this thesis tries to calculate the contribution rate of technical progress, labor and capital in economic growth of Anhui construction industry with the method of linear regression, empirically analyze the external factors affecting the development of Anhui construction industry by means of co-integration and granger causality test, and predict the development of Anhui construction industry by using the method of principal components regression.

本文首先对国内外有关建筑业发展影响因素的研究现状进行详细论述,界定建筑业的内涵和介绍建筑业的作用,研究各因素对建筑业发展的影响机理;其次,对安徽建筑业发展现状作了概括性的分析,以反映改革开放以来安徽建筑业取得的成绩和存在的不足,并运用因子分析法对安徽建筑业区域发展水平作了比较分析和综合评价;再次,运用线性回归法测算出安徽建筑业经济增长中的技术进步贡献率、劳动贡献率和资本贡献率,然后运用协整和Granger因果检验方法实证分析安徽建筑业发展的外部影响因素,运用主成分回归方法对安徽建筑业发展作了精度较高的预测。

The author of this article has the experience in development projects management and leams from domestic existing research results of construction-agent system.In this particular environment of constructions in new district,author research on the sign of construction contract,the choice of construction-agent,the scope of construction-agent,the organization of construction-agent,as well as the costs of construction-agent and management risks of construction-agent system that from the perspective of construction-agent.

本文作者在开发区从事工程项目管理工作,广泛借鉴国内已有的代建制研究成果,在城市新区建设这个特殊环境,从代建人的角度对代建合同签署、代建人选择、代建范围、代建组织方式以及代建费用管理及代建制风险等进行了应用研究。

The realized conditions of the construction industry supply chain synergy are put forward through the analysis of the construction industry vertical supply chain synergy using the method of evolutionary game (taking the construction suppliers and the general contractors for example). With the horizontal coordination problems in the construction market put forward, the synergetic mechanisms among the government, industry associations, market players and the rules of the market in the construction market are analyzed. The existed technology-economic system coordinated model is improved and the synergetic degree model of construction industry system itself is set up. The conclusion is drawn that the economic benefit indicators and technology indicators of Chinese construction industry system synergy low and the two must be synergized through the analysis of the synergetic degree of the economic benefit indicators and technology indicators of the construction industry system.

5对建筑业纵向供应链协同(以建筑供应商和总承包商为例)进行了演化博弈分析,提出了建筑业供应链协同的实现条件;分析了建筑市场中政府、行业协会、市场主体、市场规则之间的协同机制;对已有的科技——经济系统协调模型进行改进,形成了建筑业系统本身的协同度模型,并对建筑业系统的经济效益和科技指标的协同度进行分析,得出我国目前建筑业系统的经济效益指标和科技指标的协同度低,必须协同二者之间的关系。

The information to be placed in each title block of a drawing include: drawing number, drawing size, scale, weight, sheet number and number of sheets, drawing title and signatures of persons preparing, checking and approving the drawing.

每张图纸的图标栏内容包括:图号、图纸尺寸、比例、重量、张号和张数、图标、以及图纸的制图、校对、批准人的签字。

Z,Y6bI|8O'G0puq 186 The information to be placed in each title block of a drawing include: drawing number, drawing size, scale, weight, sheet number and number of sheets, drawing title and signatures of persons preparing, checking and approving the drawing.

D|Xv\dYsC 每张图纸的图标栏内容包括:图号、图纸尺寸、比例、重量、张号和张数、图标、以及图纸的制图、校对、批准人的签字。

第2/100页 首页 < 1 2 3 4 5 6 7 8 9 ... > 尾页
相关中文对照歌词
Under Construction
Drawing Me Closer
Pictures In The Sand
Drawing Crazy Patterns
Drawing A Blank
Drawing The Line
Ice Cream
Concerta
Change In The Making
Wall Around My Heart
推荐网络例句

Objective:To compare the response control and attention of Schizophrenic patients with that of the healthy controls by Integrated Visual and Auditorycontinuous performance test. To quantitate the impairment of cognitive function in patients, and to explore the relationship between cognitive function and the severity of the disorder.

目的:探讨精神分裂症病人在IVA持续操作测试中的反应控制能力、注意力等,并与健康人进行比较,从而量化精神分裂症病人的认知功能损害,并进一步探讨其认知功能与疾病严重程度的关系。

Main effective factors including subcooling degree, mechanical vibration, gas hydrate reformation, environment temperature, noncondensing gas and surfactant are analyzed.

指出过冷度、机械振动、重复生成水合物、环境温度、不凝性气体、添加剂是影响气体水合物生成的主要因素,还对R152a水合物的放冷进行了实验研究。

Water is the construction and development of socio-economic basis,and strategic resources.

水是社会经济建设与发展的的基础性,战略性资源。